
Overall Solutions
Cage Build
Installing high-density servers, GPUs, and networking equipment while ensuring optimal fiber optic connectivity for artificial intelligence workloads.
Services
Infrastructure Cabling
Providing specialized fiber optic cabling for edge computing, delivering high-speed, low-latency connections that enable real-time data processing at distributed locations.
Project Management
Overseeing timelines and quality assurance from site surveys through fiber optic installation and testing to ensure seamless integration of low-latency networking systems.
Power & Cooling
Ensuring fiber optic cabling is properly routed around critical infrastructure to maintain optimal performance in distributed computing environments.
Fiber Splicing & Testing
Conducting OTDR testing and connectivity verification to ensure optimal performance for real-time processing applications.
GPU Cluster Builds
Using AI-driven tools to design and deploy precision fiber optic networks for edge computing, ensuring optimal performance and minimal latency for distributed AI workloads at remote locations.
Services
Decommission Services
Ensuring the careful, methodical removal of fiber optic cabling and network equipment from hyperscale data centers, maintaining the highest standards of professionalism, documentation, and environmental responsibility throughout the entire decommissioning process.
Logistic Services
Providing comprehensive coordination of equipment delivery, inventory management, and precise scheduling to ensure all fiber optic materials and components arrive on-site exactly when needed, maintaining the meticulous timing and organization that defines premium hyperscale data center installations.
Built on Trust
Delivering transparent communication, meticulous documentation, and consistent adherence to promised timelines and specifications, ensuring that every hyperscale data center client can rely on CIS's commitment to precision, professionalism, and accountability throughout the entire fiber optic infrastructure deployment process.
Fusion or mechanical spice fiber optic cables with precision
Splicing Certifications
Using splicing machines and tools correctly
Ensure low signal loss and high performance after splicing
Adhere to industry standards (e.g., TIA/EIA, ISO/IEC).
Using OTDRs (Optical Time-Domain Reflectometers), power meters, and lightsources
Testing Certifications
Measuring insertion loss, return loss, and fiber continuity
Interpreting test results and creating documentation for network performance
Troubleshooting fiber network faults efficiently
There are no upcoming events at this time.